Recent work

Our
projects

From hard rock bores in the Pilbara to gas, water and power networks across metropolitan Perth, here's a selection of recent Evale Drilling work.

Evale rig and support trucks beside a Pilbara highway at dawn
7km

Pilbara · Tom Price to Nanutarra

Drilled through extensive hard rock using our air hammer capability, in extreme weather and environmentally and culturally sensitive areas.

TelecommunicationsVermeer D36x50Air hammerRegional WA
Evale crew drilling beside the road
20+km

Benang / ATCO · Bassendean and Shoalwater

More than 20km of 63mm, 110mm and 160mm gas mains installed by HDD for Benang and ATCO through Bassendean and Shoalwater.

Gas63mm · 110mm · 160mmPerth metro
PE water main strung out along the road reserve in Hope Valley
160m

DN315 water main · Hope Valley

Installed by HDD for Water Corporation through varying ground including limestone, completed in two days.

WaterDN315Limestone
JT21 set up beside a commercial site
600m

Fire and water mains · Shopping centre

180mm fire main and 125mm water main installed within a busy shopping centre environment.

Water180mm · 125mmCommercial
Evale truck with orange power conduit on the trailer
LV

Western Power · cable installation

Our Vermeer 23x30 crew completing a new LV cable installation to support network upgrades and customer connections.

PowerVermeer D23x30
Residential street bore
24/7

Water Corporation · services and emergency works

Our Ditch Witch JT10 crew undertaking new water service installations and responding to emergency maintenance works across the network.

WaterDitch Witch JT10Emergency response
Get in touch

Got a project
for us?

Request a quote